There are a lot of customers want to buy vacuum molding machine do blister project, but I don't know how to buy the vacuum forming machine, the bottom is simple to introduce:

a, previous customer consultation: way 1: call inquiry, route 2: fax inquiry, third way: Email inquiry, way four: through the network chat tools inquiry. Want to buy vacuum molding machine customers must provide blister products of length, width and height and thickness of the material used ( Or g) , color and model ( PVC、PET、PS、PP) , the product quantity and production cycle.

2, vacuum molding machine business quotation: blister products unit price levels associated with the following factors: the length, width and height of blister products and the complexity of the vacuum forming; The type of materials used, thickness and color; Blister products after processing technology ( Folding, punching, sealing side, etc. ) , order quantity and the order cycle. Offer member will be described to the customer's samples and have a initial quotation, prices can be coordinated.

3, blister equipment technology department technical personnel design: customer to offer basic approval, will demand, physical, or blister sample to the sales department, production dispatch meetings require computer design department of the customer's real scanning and combined with the design of the print, making the blister products of plane design

4, blister proofing: customer approval after the computer design draft production dispatch meetings, according to the complexity of the blister products decided to adopt what kind of way to develop the mould, Plaster mold, copper, aluminum die) 3 -, the development cycle 5 days.

5, production blister mould: after samples approved by the customer, usually under a certain amount of production orders. Production dispatch meetings depending on the complexity of the production, vacuum forming decided to adopt what kind of mold production. The whole production cycle of moulds should be 5 to 7 days.

6, vacuum forming production: adopts fully automatic high-speed blister molding machine, its basic principle is: will roll sheet into electric oven heated to softening, take hot again pull to blister mould, and the mold. if and pumping air into vacuum state, will soften the sheet to the mold surface adsorption, at the same time, the cooling water to spray fog forming sheet surface, make its hardening, forming the sheet is pulled to the storage tank automatically again, pneumatic cutting knife molding and forming sheet separation, to complete the process.

7, cutting edge trimming: vacuum forming large products must pass a punch, with a knife version segmentation as a single piece of product. Its principle is on the punch at the bottom of the table has a large piece of plastic cutting board, put the layout of molding products on the chopping block, and to make the knife mould card on a single product, through the up and down movement of the punch, cutting out a single product.

recent launch of the manipulator six-station blister packing machine, is a genuine & other; Sanduo & throughout; Machine, at the same time also have & other; Three little & throughout; Characteristics:

the so-called & other; Sanduo & throughout; Is to point to:

first, & other; Hand & throughout; More. About the high frequency welding machine with two manipulators, will both opening up, the operator will receive a big relief, at the same time also bring another is endless and the productivity of production.

second, & other; Groove & throughout; More. Six-station high welding machine on the basis of the original 4 Labour added two slots, make full use of the development potential of the high frequency machine.

the third, & the other; Throughout the skill &; More. Resettlement chassis for blister, packaging products, put on the blister, to welding, cutting, to waste and to remove the finished product, into the turnover box, such as more talent show, the operator just follow the rhythm in the raw material.

the so-called & other; Three little & throughout; Is to point to:

staff less & ndash; — A high six-station Zhou Boji can only need one operator implementation, the operator as long as raw materials, the rest of the time is responsible for monitoring the operation of the machine.

less time & ndash; — The entire product welding process requires only 0 10 s, six products at the same time, advance wave upon wave type bounding welding machine, to give you this is the rhythm.

less space & ndash; — The device is made up of two manipulators and a disk of welding, seemingly large one device, it covers an area of very compact. The three parts overlap placed, greatly save the span.